Order Failed Submission on a single change order submission

Prev Next

If a problem occurred, the item in error is displayed in red on the Review and Submit Order window.  

(Show picture)

BulkEqmtChngOrderFailedSingle

  1. Click the Actions button and select View Errors. This displays the Errors for Order 'New Order' window.

  2. Click on error information row. This displays the complete description of the error in the lower section of the window.  

    (Show picture)

    ErrorsForNewOrder

    The Errors for Order 'New Order' window contains the following information:

    Error Type

    Kind of error that occurred.

    Order Line Item

    Order line item associated with the error.

    Description

    Short description of the error.

    Click on the row to see a full description of the error in the lower section of the window.

    Based on the description of the error, determine the action required to fix it.

  3. Click Close. You are returned to the Review and Submit Order window of the Bulk Equipment Order Wizard.