IDI version 26.8 is now available.  Click here for details: IDI Updates.

Adding a Change Sheet

Prev Next

To add a Change Sheet to a Bulk Equipment Change:

  1. From either the Bulk Equipment Inventory Changes - Pending Queue window or the Bulk Equipment Inventory Changes - Search Results window, right-click a row and select Change Sheets. This displays the Bulk Equipment Inventory Change Sheets window for the selected Bulk Equipment Change. See Viewing Bulk Equipment Change Sheets.

  2. Right-click in the change sheets area and select New. This displays the Add Bulk Equipment Change Sheet window.  

    (Show picture)

    AddBulkEqmtChangeSheet

  3. Enter the required information as described below:

    Sheet Number

    Alphanumeric identifier of the change sheet. Maximum characters: 50. Required.

    Description

    Work involved in the change sheet. Maximum characters: 255. Required.

    Estimated Due Date

    Planned completion date for the work associated with the change sheet. Defaults to the current date.

    Rank
    (read-only)

    Current order in which the change sheets are to be worked. 1 being first, 2 second, etc.

  1. Click Save.